A 37-storey result, measured in project terms.
For Locust 8, a Hi-Rise Group and Fengate project, Structure Pal examined an above-ground reinforced-concrete scope of 18,300 yd³ (14,000 m³). The result was less concrete, lower hard cost, and a material reduction in embodied CO₂.
37
Story high-rise
$1.1M
In hard cost savings
717
Tons of CO2 avoided
1400
Cubic meters of Reinforced concrete saved

.png)
A 50-storey building in the heart of Pickering city
"Working with Structure Pal, our team identified opportunities to optimize approximately 1,500 m³ of concrete and 105 tones of structural steel while maintaining design intent, constructability, and schedule.
- 𝗖𝗲𝗻𝘁𝗿𝗲𝗰𝗼𝘂𝗿𝘁
50
Story high-rise
105
Tons of structural steel reduced
750
Tons of CO2 avoided
1500
Cubic meters of Reinforced concrete saved


A 53-storey result in down town Toronto
"Our firm worked with Structure pal on the 170 Roehampton project, a 53-storey residential tower in Toronto, to identify more efficient structural framing solutions. Structure pal’s early involvement in the design process helped minimize unnecessary redesign and rework. Through a collaborative approach with Sweeny&Co Architects, Ownership and Structure Pal, we were able to identify significant opportunities for concrete and reinforcing steel savings across the project. Their innovative approach to structural optimization and ability to integrate into the design process made them a valuable partner to our team."
Jablonsky & Ast. Engineers
53
Story high-rise
84
Tons of structural steel reduced
596
Tons of CO2 avoided
1193
Cubic meters of Reinforced concrete saved