top of page

Find savings before
the structure is fixed.

For developers, owners, and their structural engineers:

Send the current ETABS or FEM model and receive a decision-ready PDF plus an updated model in about 1–2 days. See concrete and cost options without taking design authority away from the project engineer.

Where is the material working-and where is it not?

Put stiffness where the tower needs it.

Examine cast-in-place reinforced-concrete shear-wall systems under wind and seismic demands. Structure Pal studies practical distributions of stiffness, wall thickness, concrete grades, and selected layout alternatives against project criteria for drift and acceleration.

The target is a buildable set of changes: lower concrete volume and cost without adding construction complexity. The project structural engineer reviews every recommendation against the full design basis.

Wall thickness and concrete grade by level

Stiffness distribution through the building

Drift and acceleration context

Practical wall-layout alternatives where useful

Concrete-volume and cost comparisons

image1971_edited.png

Four steps. Leaner project.

01

Frame the decision

We align on the project stage, structural question, applicable criteria, and the decisions still open to the team.

02

Share the working model

Your team provides the current ETABS or FEM model with the agreed project inputs and assumptions. We confirm the scope before the study begins.

03

Run the study together

Structure Pal works in collaboration with the project structural engineer, raising questions as they appear and keeping proposed changes tied to buildability.

04

Review the options

In about 1–2 days, receive the PDF and updated model. The project structural engineer checks the inputs and recommendations, selects what is appropriate, and completes the project design.

Material your team can review.

Decision-ready PDF

An organized record of the study, including plans, assumptions, proposed changes, and quantified material, cost, savings, and ROI context where applicable.

Level-by-level views

Clear plan markups showing where elements may thicken, remain, or reduce, with the engineering context needed for review.

Screenshot_4_edited.png
Gemini_Generated_Image_9ocwgl9ocwgl9ocw_
Updated structural model

An ETABS or FEM model containing the proposed changes, ready for the project structural engineer to inspect and independently check.

Collaborative review

A focused discussion with the developer and project structural engineer so commercial impact and structural responsibility remain connected.

Pricing

SINGLE PROJECT

$2 USD 

per m² GFA

A first engagement or a defined mid- or high-rise project.

  • One agreed operator-run optimization study

  • Lateral Optimization, Layout Insights, or a project-specific combination

  • Collaboration with the project structural engineer

  • Decision-ready PDF and updated ETABS or FEM model

  • Typical delivery in about 1–2 days after inputs are confirmed

  • Minimum 3:1 ROI guarantee, subject to agreed terms

 

Average observed ROI:

8.5:1 high-rise · 6:1 mid-rise

ANNUAL RETAINER

Contact Us

Developers and engineering teams with several structures to review each year.

  • Up to 7 projects during the annual term

  • Operator-run studies scoped to each project

  • Collaboration with each project’s structural engineer

  • PDF and updated model for each completed study

  • A repeatable review process across the pipeline

 

Average observed ROI:

13.5:1 high-rise · 7.5:1 mid-rise

Ramat Gan, Israel office.​

Jabotinsky 7, Moshe Aviv tower.

office@structure-pal.com

  • LinkedIn

All rights reserved to Structure-Pal Ltd 2026

bottom of page